Traffic Impact Calculator
Analyze traffic impact and trip generation for development projects using ITE trip rates
Project Information
Trip Reductions (%)
Trips already on adjacent roadway
Trips within mixed-use development
Road Conditions
✓ Meets Target LOS
Actual LOS
LOS A
Free flow
V/C Ratio
0.04
Trip Generation Summary
Daily
550
Net: 385
AM Peak
78
Net: 55
PM Peak
75
Net: 53
Total reduction: 30.0%
PM Peak Distribution
Inbound Trips45 (85%)
Outbound Trips8 (15%)
Road Impact Analysis
Existing Traffic0 vph
Project Traffic+53 vph
Total Peak Traffic53 vph
Road Capacity1,500 vph
ITE Trip Rates Used
Land Use: Office
Daily Rate: 11 trips per 1000 sqft
AM Peak Rate: 1.56 trips per 1000 sqft
PM Peak Rate: 1.49 trips per 1000 sqft
💡
Help us improve!
How would you rate the Traffic Impact Calculator?
Editorial Note
MyCalcBuddy Editorial Team
This page is maintained as an educational calculator reference.
📚
Formula Source: Standard Mathematical References
by Various
🔄Last reviewed: May 2026
✓Formula checks are based on standard references and internal QA review.