Traffic Impact Calculator

Analyze traffic impact and trip generation for development projects using ITE trip rates

Project Information

Trip Reductions (%)

Trips already on adjacent roadway

Trips within mixed-use development

Road Conditions

βœ“ Meets Target LOS

Actual LOS

LOS A

Free flow

V/C Ratio

0.04

Trip Generation Summary

Daily

550

Net: 385

AM Peak

78

Net: 55

PM Peak

75

Net: 53

Total reduction: 30.0%

PM Peak Distribution

Inbound Trips45 (85%)
Outbound Trips8 (15%)

Road Impact Analysis

Existing Traffic0 vph
Project Traffic+53 vph

Total Peak Traffic53 vph
Road Capacity1,500 vph

ITE Trip Rates Used

Land Use: Office

Daily Rate: 11 trips per 1000 sqft

AM Peak Rate: 1.56 trips per 1000 sqft

PM Peak Rate: 1.49 trips per 1000 sqft