HVAC Load Calculation
Calculate heating and cooling loads using Manual J principles
Building Parameters
Load Calculation Results
Load Components
Envelope Load:1949 BTU/hrWindow Load:32700 BTU/hrInternal Gains:1800 BTU/hrVentilation Load:1490 BTU/hrLighting/Equipment:7000 BTU/hr
Total Cooling Load
44939 BTU/hr
3.74 tons
Total Heating Load
5739 BTU/hr
5.7 MBH
Design Loads (with 15% safety)
Cooling Design:51680 BTU/hrHeating Design:6600 BTU/hrVentilation:60 CFM
Note: This is a simplified calculation. For accurate sizing, perform a full Manual J calculation considering all building components and local climate data.